Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Study of Re-development of Cikoneng Micro-hydro Power Plant
Date
2015
Location
Banten
Project type
Technical Study [Member's Portofolio]
The Re-development of Cikoneng Micro-hydro Power Plant was carried out in 2015 for the Division of Energy Banten. The project, located in Banten, involved a comprehensive analysis of the existing infrastructure and the technical requirements necessary for re-developing the micro-hydro power plant. This initiative was crucial in enhancing the renewable energy capacity of the region, contributing to both local energy needs and the broader goal of sustainable energy development in Indonesia.
One of the engineering consultants from Geni, Hafif Dafiqurrohman, participated in this project. His role was to conduct a detailed analysis of the components required for the re-development of the power plant. This responsibility included evaluating the current condition of the facility, identifying necessary upgrades, and offering recommendations on technical improvements to optimize energy production and ensure the long-term operational efficiency of the micro-hydro power plant.